TThe project included the complete interior gut along with asbestos removal within an eight-story residential housing YMCA building, which was occupied at the time the work was being done. The entire mechanical demolition included boilers, chillers, elevators, and more. To expedite the demolition, a 453 Bobcat was craned in on each floor.